Commercial Concrete Services in Kansas City
Sidewalks, pads, curbs, ADA ramps, and slab repair — all handled in-house by our own crew.
Where a Parking Lot Needs More Than Asphalt
Most commercial lots have spots where asphalt is not the right fit: sidewalks and pedestrian paths, dumpster pads that take repeated heavy loads, loading dock aprons, drive-through lanes, curbs and gutters for drainage control, and ADA-compliant ramps at every pedestrian crossing. Platinum Paving installs and repairs all of these in-house — and because we also do the asphalt, one crew coordinates the whole lot without trade conflicts or scheduling gaps.
Why Property Managers Hire Us for Flatwork
Because we do the whole lot, not just one trade. When a project involves both asphalt and concrete — and most do — you get one warranty, one schedule, and one point of accountability. No coordinating between trades, no conflicting timelines, no finger-pointing when something does not line up. Our crew has poured everything from single dumpster pads to full sidewalk systems across the metro. Call (913) 701-6044 for your free estimate.
What We Pour and Repair
Get a Free Estimate
Tell us about the project and we'll schedule a free on-site assessment — or call (913) 701-6044.
Frequently Asked Questions
What concrete work does Platinum Paving do?
New flatwork (sidewalks, pads, aprons), slab replacement and spall repair, curbs and gutters (barrier, rollover, combination), and ADA work (ramps, signage, stall marking).
How long does commercial concrete last?
Properly installed, it lasts 25 to 30+ years in a parking lot. The main threats are freeze-thaw cycling and deicing salt, both manageable with proper mix design and finishing.
Do you do both asphalt and concrete?
Yes. We are one of the few KC metro contractors that handles both in-house — one schedule and one warranty for the entire lot.
When should I use concrete instead of asphalt?
It is the right choice for high-load areas (dumpster pads, loading docks), sidewalks, ADA ramps, curbs, and anywhere that needs 25+ year durability under heavy point loads.
How soon can we use a new pour?
Light foot traffic in 24 to 48 hours. Vehicle traffic after 7 days. Heavy loads (dumpster trucks) after 28 days, once the slab reaches full design strength.
One Crew for the Whole Lot
Sidewalks, pads, curbs, ADA ramps, and repairs — all in-house. 4,000+ projects. 1-year warranty.