New Asphalt Paving
Full-depth asphalt construction for industrial truck courts, retail lots, and institutional campuses. We engineer every section for the specific traffic loads and Clay County soil conditions present on your site.
- 8–12 inch aggregate base lifts over geotextile fabric on Clay County plastic clay subgrades
- HMA surface courses placed at 290–310°F and compacted to 94%+ Marshall density
- Heavy-duty 6-inch full-depth sections for Commerce Center truck court applications
- Positive drainage grading at 1.5–2% slope to prevent standing water on clay soils









